The plan was to hire twelve people. They hired none, and the company added the capacity of a much bigger team anyway.
Here’s what was happening. A $40M sports equipment manufacturer wanted to reach $80M, but design and estimating had become a wall. Quotes took ten days to get out. Estimators rebuilt the same numbers from scratch every time. Everyone was slammed, and the CEO did what most CEOs do when the team is slammed. He reached for headcount.
More people inside a process that doesn’t work doesn’t buy you more output. It buys you more payroll and the same wall.
I thought I had a staffing problem. I had a process problem.
President
So Jane Gentry ran an Execution Sprint and fixed the process first. Clear ownership of each step. The redundant handoffs, gone. Standard inputs, so estimating stopped starting from a blank page every time.
Quote turnaround dropped from ten days to four. The same team took on 50% more volume. Faster quotes lifted the win rate by six points, because in their market the first credible bid usually wins. Three points of margin came back from the overtime and expediting the bottleneck had been quietly running up.
Twelve people not hired. A clear path to $80M on the team already in the building.
If your team is working harder every quarter and still falling behind, an Execution Sprint starts by finding where your throughput actually breaks.
See your Potential in Focus
Experience a 30-minute complimentary session with Jane that delves into your business challenges and goals. Uncover new perspectives, explore possibilities, and walk away with a refreshed outlook on your next steps. This brief but impactful consultation is designed to inspire and guide your journey forward.